Project Profiles

All Aboard Florida

Phase I – High Speed Passenger Rail – Florida

The All Aboard Florida (AAF) High Speed Passenger Rail project will develop a new, approximate 40 mile segment of dedicated right-of-way (ROW), referred to as the East / West (E/W) segment, exclusively for AAF passenger train operations along the SR528 Corridor from Orlando International Airport to City Point. At City Point the E/W segment will tie into the existing FECR ROW, with the proposed passenger service diverging southward along the FECR mainlines to Miami, currently in Phase-I Infrastructure for this project.

As part of the HNTB team, Ardmore’s responsibilities include:

  • Establishing and Creating Process Plans, Workflows, Training and monitoring all aspects of PMWeb (AAF’s Web based program).
  • Review and process RFI’s and Submittals, Generate and maintain various Logs for the project.
  • Maintaining Meeting minutes and proper documentation.
  • Assist Project Controls and Construction Manager.
  • MOT Internal Coordination meeting for permitting and coordination Contractors, AAF. FECR and FDOT. Generate and Maintain Folder Structures.
  • Maintain Redline/Revised plans/drawings log, along with other tasks as the project progresses.

Comments are closed.

Read more about us in News>
Return to the top of the page>