The O’Hare Modernization Program (OMP)

Ardmore provides construction management for the O’Hare Modernization Program, the $6.6 billion project that will reconfigure O’Hare Airport’s intersecting runways into a more parallel configuration.

Ardmore is a sub-consultant to Parsons Brinkerhoff on this multi – year expansion of O’Hare International Airport, providing the North Airfield Site Manager, the South Airfield Zone Manger, Lead Resident Engineers, Office Engineers, Assistant Resident Engineers, Project Managers, and Field Inspectors.

Our North Airfield Site and South Airfield Zone Managers are responsible for the coordination of all aspects of airside and landside construction activities between Contractors and the Department of Aviation (Airport Authority) at O’Hare Airport.

North Airfield: Site Management Projects – Lead Resident Engineer/Site Manager

New, Runways, Utilities, FAA Control Tower, Water Main Relocation, Site Grading, Pump Stations, NAVAIDS, Roads

South Airfield: South Basin Projects – Lead Resident Engineer/Zone Manager

Extension of Taxiway Kilo, Relocation of DOA, FAA and ComEd Utilities, Filling In Existing Lake O’Hare, Creating New Airside Detention Basin, South Basin Drainage and Mass Grading, New Pump Station, Oil Water Separator Structures, Energy Dissipation Structures, Utilities and Drainage, Relocation and Construction of the Union Pacific Railroad

Relocation and Construction of the Union Pacific Railroad

Our Lead Resident Engineer provided design and constructability review of drawings and specifications and oversight for the relocation and construction of the Union Pacific Railroad mainline track to a new Interim Rail Alignment to allow for the expansion of O’Hare Airport to the west and south of its present limits.